Project Name | Date | Faults | Distance | Use Of Sewer | Flow Direction | Total Inspection Time (Minutes) | Asset ID | Asset Type | Asset Size | Pacp Quick Struct Rating | Pacp Quick Maint Rating | Pacp Quick Overall Rating |
TC4 | 5/4/2009 1:54:00 PM | 4 | 22.8 | Sanitary | Upstream | 5 | TC4-M8-8 to TC4-M8-7 | Polyvinyl Chloride | 8 | 2100 | 0000 | 2100 |
TC4 | 5/5/2009 1:44:00 PM | 21 | 296.6 | Sanitary | Downstream | 35 | TC4-M8-7 to TC4-M8-8 | Vitrified Clay Pipe | 8 | 5142 | 2115 | 5142 |
Total Project Name | Total Date | Total Faults | Total Distance | Total Use Of Sewer | Total Flow Direction | Total Total Inspection Time (Minutes) | Total Asset ID | Total Asset Type | Total Asset Size | Total Pacp Quick Struct Rating | Total Pacp Quick Maint Rating | Total Pacp Quick Overall Rating |
1 | 2 | 25 | 319.4 | 1 | 2 | 40 | 2 | 2 | 1 | 7242 | 2115 | 7242 |